Description
In the Linux kernel, the following vulnerability has been resolved:
scsi: target: iscsi: Fix use-after-free in iscsit_dec_conn_usage_count()
In iscsit_dec_conn_usage_count(), the function calls complete() while holding the conn->conn_usage_lock. As soon as complete() is invoked, the waiter (such as iscsit_close_connection()) may wake up and proceed to free the iscsit_conn structure.
If the waiter frees the memory before the current thread reaches spin_unlock_bh(), it results in a KASAN slab-use-after-free as the function attempts to release a lock within the already-freed connection structure.
Fix this by releasing the spinlock before calling complete().
Metrics
CVSS:3.1/AV:L/AC:L/PR:L/UI:N/S:U/C:H/I:H/A:HWeakness enumeration
Affected software
| Vendor | Product | Versions |
|---|---|---|
| Linux | Linux | >= e48354ce078c079996f89d715dfa44814b4eba01, < ba684191437380a07b27666eb4e72748be1ea201; >= e48354ce078c079996f89d715dfa44814b4eba01, < 8518f072fc92921418cd9ed4268dd4f3e9a8fd75; >= e48354ce078c079996f89d715dfa44814b4eba01, < 275016a551ba1a068a3bd6171b18611726b67110; >= e48354ce078c079996f89d715dfa44814b4eba01, < 73b487d44bf4f92942629d578381f89c326ff77f; >= e48354ce078c079996f89d715dfa44814b4eba01, < 48fe983e92de2c59d143fe38362ad17ba23ec7f3; >= e48354ce078c079996f89d715dfa44814b4eba01, < 3835e49e146a4e6e7787b29465f1a23379b6ec44; >= e48354ce078c079996f89d715dfa44814b4eba01, < 9411a89e9e7135cc459178fa77a3f1d6191ae903 |
| Linux | Linux | 3.1 |
References
- https://git.kernel.org/stable/c/275016a551ba1a068a3bd6171b18611726b67110Patch
- https://git.kernel.org/stable/c/3835e49e146a4e6e7787b29465f1a23379b6ec44Patch
- https://git.kernel.org/stable/c/48fe983e92de2c59d143fe38362ad17ba23ec7f3Patch
- https://git.kernel.org/stable/c/73b487d44bf4f92942629d578381f89c326ff77fPatch
- https://git.kernel.org/stable/c/8518f072fc92921418cd9ed4268dd4f3e9a8fd75Patch
- https://git.kernel.org/stable/c/9411a89e9e7135cc459178fa77a3f1d6191ae903Patch
- https://git.kernel.org/stable/c/ba684191437380a07b27666eb4e72748be1ea201Patch
Timeline
- Published
- Feb 18, 2026
- Last modified
- Oct 19, 2026
- NVD status
- Modified